Make a Rough Estimate You Can Audit

Write a reusable prompt with replaceable inputs. Submit your prompt and one test output for this example.

Task: Create a range-based estimate for a fictional content migration.

Example input: A team has 120 help articles. Forty are short, 50 are medium, and 30 are long. Estimated cleanup per article: short 5–10 minutes, medium 10–20, long 20–35. Every article also needs a separate 3–5 minute review. Setup takes 2 hours once. Two people each have 3 focused hours per day available for this project. Assume work can be divided freely and these are effort estimates rather than guaranteed throughput.

Constraints:

  • Calculate minimum and maximum total effort before converting to workdays.
  • Keep person-hours distinct from elapsed team days.
  • Add a separate 15% contingency range and show the formula.

Required output from your prompt: Provide the estimate, an assumption list, and a brief recommendation about what to measure in a ten-article pilot.

Success checks:

  • All 120 articles and the review step are included exactly once.
  • Setup is counted once.
  • Daily capacity is six person-hours.
  • The estimate remains a range and identifies the largest source of uncertainty.
by Abdul Mohammed0 solutions
No solutions yet — be the first to submit one.
Prompt Challenges

Have the perfect prompt? Submit it.

Open it in Prompt Dock — any creator can link one of their published prompts as a solution.

Submit a solutionSign in to submit — any creator plan, free included.
Free to start

Need a prompt built? Post a challenge.